Quality Assurance

Quality & Testing

Quality is built into the process, not inspected in at the end — traceable material, controlled machining, documented testing and consistent packing on every order.

Inspected instrumentation fittings and gauge accessories
100% Tested& inspected before dispatch
Quality Policy

Fittings That Seal the First Time

At Kalpataru Pipe & Fittings, our quality policy is simple: supply instrumentation fittings and valves that meet the ordered specification, seal reliably in service and arrive with complete, honest documentation.

We achieve this by verifying raw material before machining, controlling dimensions during production, pressure testing before packing and keeping heat-number traceability from bar stock to finished part — while continually improving our processes and reducing our environmental impact in line with ISO 14001 and ZED principles.

  • MTC-verified raw material
  • Heat code traceability
  • Thread gauge inspection
  • Pressure tested
  • Documented results
  • Continual improvement
0%Products Tested & Inspected
0+Years of Manufacturing
0+Product Types Covered
0Certifications & Registrations
01
QA Process

Our Quality Assurance Process

Incoming Material Check

Bar stock and forgings checked against the mill test certificate (MTC) for grade, size and heat number.

PMI

Positive material identification confirms the alloy chemistry before the material is released to machining.

In-Process Inspection

Dimensional checks at set intervals during CNC machining on bores, lengths, hex sizes and sealing faces.

Thread Gauging

NPT, BSP, BSPT and other threads verified with plug and ring gauges for correct form and engagement.

Hydro / Pneumatic Testing

Shell and seat testing of valves and pressure testing of fittings to confirm leak-tight performance.

Final Inspection

Visual, marking and quantity check against the order before parts are bagged, tagged and packed.

Documentation

Material certificates and test certificates compiled and dispatched with the consignment.

02
Testing Facilities

Tests & Inspections We Perform

Test / InspectionMethodApplied To
Hydrostatic Shell TestBody pressurised with water above rated working pressure, held and checked for leakage or deformationNeedle, manifold, gauge, mono flange, ball & check valves
Seat Leak TestAir / nitrogen applied against the closed seat, checked air-under-water for bubblesNeedle, manifold, ball & check valves
Pneumatic TestAir / nitrogen pressure test with leak detectionTube fittings, valves, air headers
PMIPositive material identification of alloy chemistryRaw material & finished parts in SS and alloy grades
Dimensional InspectionVernier, micrometer and height gauge checks against drawingAll fittings, valves and accessories
Thread GaugingPlug and ring thread gauges (NPT, BSP, BSPT, UNF, Metric)All threaded ends
Hardness TestHardness check on material and critical componentsBar stock, ferrules, valve stems
Visual InspectionSurface finish, burrs, sealing faces and marking100% of finished products
Test pressure, medium and acceptance criteria are confirmed per product and order. Specific test requirements can be agreed at the enquiry stage.
03
Documentation

Documents Supplied With Your Order

EN 10204 3.1 MTC

Material test certificate with heat number, chemical composition and mechanical properties.

Test Certificate

Pressure test and inspection report for the supplied valves and fittings.

Third Party Inspection

TPI by your nominated agency — available on request.

NACE Compliance

Material conforming to NACE requirements for sour service — available on request.

Oxygen Cleaning

Cleaning for oxygen service — available on request.

Heat Code Traceability

Heat numbers marked and recorded so every part can be traced back to its material certificate.

04
Certifications

Certified & Registered

ISO 14001

Environmental management system certification, issued by AQSR (USAC accredited).

ZED Certified

Zero Defect Zero Effect certification — quality manufacturing with minimal environmental impact.

MSME Registered

Registered Micro, Small & Medium Enterprise under the Government of India.

05
FAQ

Quality Questions Answered

Are all your products pressure tested?
Yes. Our valves and fittings are pressure tested and dimensionally inspected before packing. Valves receive shell and seat testing; test reports are supplied with the order.
Do you provide EN 10204 3.1 material certificates?
Yes. We supply EN 10204 3.1 material test certificates showing heat number, chemical composition and mechanical properties, along with our test certificate for the supplied items.
Can a third party inspect the material before dispatch?
Third party inspection (TPI) by your nominated agency is available on request. Please mention the TPI requirement at the enquiry stage so it can be planned into the schedule.
Do you offer NACE compliant material or oxygen cleaning?
Both NACE compliant material for sour service and cleaning for oxygen service are available on request. Share your specification and we will confirm feasibility, documentation and lead time.

Need Certified Fittings for Your Project?

Send your bill of materials and inspection requirements — we will quote with documentation and delivery schedule.